Objective
A shared technology centre was to be created for application engineering and other development functions. The aim was to bring together previously separate and partly inadequate facilities, critically review user needs and develop a cost-effective building for research, development and customer-focused application engineering.
Implementation
MPS ARCHONIC identified the needs of the different business units in joint workshops and reviewed space requirements, functions and potential synergies before detailed building design began. This formed the basis for an integrated building and energy concept combining architecture, use and technical requirements.
Result
A technology centre tailored to actual user needs, with modern laboratory, development and application areas. An integrated energy concept using ground collectors, the River Erms and thermally activated building elements enables particularly efficient heating and cooling.
Bringing two business units together in a shared building concept
Application engineering and other development functions had their own structures and requirements. For the new technology centre, these needs had to be considered together for the first time, critically reviewed and translated into a cost-effective overall concept.
Initial Situation
- Development, laboratory and application areas spread across different premises
- Some premises inadequate or rented
- Two largely separate business units with their own requirements
- Both areas were to be brought together in a shared new building
- Different requirements for workshops, laboratories and technical equipment
- High expectations for a modern, customer-focused working environment
Challenge
- Combine the needs of both business units in a shared concept
- Critically review duplicate facilities and separately requested spaces
- Identify shared functions and potential synergies
- Reliably establish actual space requirements before building design
- Integrate different technical requirements within one building structure
- Ensure cost-effectiveness despite demanding user and technical requirements
User needs as the basis for cost-effective building design
MPS ARCHONIC brought together the requirements of the different areas and developed an integrated building and energy concept.
Requirements & User Engagement
- Systematically identified the needs of both areas through workshops
- Considered activities, spaces and technical requirements together
- Critically reviewed duplicate facilities and potential shared uses
- Translated requirements into a coordinated schedule of spaces and functions
- Optimised space requirements before further building design
- Developed the architecture consistently around processes and future uses
Building & Energy Concept
- Functionally integrated laboratory, development, workshop and application areas
- Incorporated technical and utility requirements into planning early on
- Integrated ground collectors and the River Erms as renewable energy sources
- Thermally activated walls and ceilings for efficient temperature control
- Coordinated energy, building and use concepts through integrated planning
- Adapted planning to changing budgets and constraints during the project
A technology centre for development, application and collaboration
Different user requirements were translated into a shared technology centre that combines modern working conditions with efficient, future-ready building systems.
Outcome & Added Value
- Brought development, laboratory and application areas together at one site
- Created a modern working environment tailored to the needs of research and application engineering
- Spatial proximity improves interaction and collaboration between areas
- Systematically reviewed and optimised user needs and spaces before implementation
- Implemented an integrated energy concept with ground collectors, the Erms and thermally activated building elements
- High-quality application areas provide an impressive setting for collaboration with customers
Distinctive Feature
MPS ARCHONIC began with users and their processes before building design commenced. Requirements from different areas were developed jointly, synergies assessed and translated into a coordinated space and functional concept. Combined with the site-specific energy concept, this created a technology centre in which use, architecture and building systems were developed through integrated planning.
Let's get our joint
project off the ground
We empower people and their organizations to become future-ready in a world shaped by complex change and global uncertainty.
Let’s start a conversation. We will be happy to advise you.
Tobias Knappe
Managing Partner