Relocate complex chemical production under tight deadlines

HENKEL

  • Design Review
  • Project Management
  • Construction Management
  • BIM

See all references

HENKEL
Client
Yantai, China
Location
Chemical Industry
Sector
Production / Logistics / Administration
Building Type
50,000 sqm
Production area

Objective

The existing Henkel site had to be vacated due to the urban development of the former industrial area. The complex chemical production therefore had to be relocated to a new, long-term expandable site within a short timeframe.

 

Implementation

MPS ARCHONIC joined the project at an advanced planning stage, reviewed the planning and tender documents within six weeks, and subsequently took over the coordination and supervision of the implementation. An interdisciplinary team of 14 employees supported the construction, technical installation and integration of the complex process systems.

 

Result

The first construction phase created a modern production site covering approximately 50,000 m². The optimized production structure enabled the existing production to be organized on a significantly more compact footprint while simultaneously creating the basis for further expansion phases.

The existing site had to make way for a new urban development project

The closure of the existing industrial site required a complete relocation. At the same time, lessons were learned from the limitations of the historically developed plant to organize production more efficiently at the new location.

Initial Situation

  • Existing production site had to be vacated due to urban redevelopment
  • Existing plant had grown historically across several plots
  • Broad product range with complex chemical process systems
  • High time pressure for the transition from the existing to the new site
  • New site was intended to enable long-term growth in China

Challenges

  • Relocate complex chemical production within a tight timeframe
  • Organize existing production processes within a more efficient site structure
  • Consistently align the building with the requirements of the process systems
  • Consider substantial expansion reserves from the outset in the site planning
  • Advance construction on schedule despite extreme winter conditions in northern China
  • Ensure quality and technical safety throughout the process installation the process installation

Six weeks for the review – twelve months for implementation

MPS ARCHONIC took over a project that was already well advanced and first created transparency around the planning and tendering process. The implementation was then coordinated directly on site by an interdisciplinary team.

Project Entry & Planning Review

  • Joined the project when planning was nearly complete and tendering had already taken place
  • Fully reviewed the existing planning and tender documents within six weeks
  • Identified and corrected critical issues and refined the planning
  • Adopted the existing concept as a basis and assessed its feasibility
  • Coordinated interfaces between construction, building services and production systems

Implementation & Quality Assurance

  • Deployed a 14-member interdisciplinary MPS ARCHONIC team on the project
  • Directly involved construction and process engineers in the implementation
  • Continued to support the process installation after completion of the building works
  • Inspected and approved piping, connections, tanks and technical installations
  • Inspected welded joints and pressure-bearing systems
  • Supported technical approvals as a basis for subsequent regulatory inspections

Process plants, building services, and buildings coordinated in a BIM model

Thousands of meters of piping, tanks and technical systems had to be integrated with the architecture and building services to create a fully functional overall system. BIM became the central tool for coordination and continuously updating the actual construction status.

Process Systems in the BIM Model

  • Production system comprehensively represented in the BIM model
  • Process systems, tanks and piping routes treated as key planning parameters
  • Building design adapted to the requirements of production
  • Changes resulting from actual construction continuously incorporated
  • Dedicated MPS ARCHONIC employee assigned to continuously update the planning

BIM Coordination & Building Services

  • Production planning and building/building services planning by different stakeholders brought together
  • Piping routes, building services and production systems coordinated with each other
  • Clash detection used to identify spatial conflicts
  • Building services and piping routes adapted to resolve conflicts with production
  • -entilation routes also revised in coordination with the process systems

From Model to As-Built Status

  • Actual construction status documented on site
  • Deviations incorporated back into the planning
  • Drawing and model versions continuously updated
  • BIM model continuously developed through to the as-built status
  • Complex Building Management System integrated into the production environment

Increased production in a more compact space with room for further growth

The new site combines a more efficient production structure with modern infrastructure and extensive expansion opportunities to support Henkel's continued growth in China.

Result & Added Value

  • First construction phase with approximately 50,000 m² completed
  • Approximately 15,000 m² less floor area compared to the former site
  • Production buildings consistently aligned with the requirements of the process systems
  • Modern infrastructure created for highly complex chemical production
  • Further construction phases already incorporated into the site concept
  • Overall expansion to approximately 120,000 m² prepared
  • Process installation and technical quality assurance supported beyond completion 
    of the building

Key Feature

Instead of constructing a building shell and subsequently fitting the production into it, the approach was reversed: the requirements of the complex process systems determined the building design, building services and piping layout. This enabled experience from the historically developed existing plant to be systematically transferred into a more compact and long-term expandable site structure.

Contact

Let's get our joint
project off the ground